Roger 27253
Structural
- Oct 19, 2018
- 3
I am currently building a distribution center (250,000 sq/ft) with 28' min clearance @ eve, with ESFR heads approx 2500 heads and a pump on the system as well. The owner is pressing me (CM /GC) to find a way to NOT have to apply 1 hour fire proofing on the columns and structural connections (joist girders). I do not know of a way to do this. Is anyone out there aware of any way to get around this. It is strictly a budgetary issue. I strive to provide the best building practices possible and have been placed in a not so good situation with this. Any advice would be appreciated. This building is located in North Carolina and comes under the IBC 2015 North Carolina state Building Code.
Any advice is welcomed
Any advice is welcomed