gopher669
Civil/Environmental
- Jun 15, 2010
- 11
So, I'm going through RAS and doing the Method 4 & 5 Encroachment method to define my floodway. Everything is going fine for the first 3500 feet, until I get to the first cross section after it changes from concrete (upstream) to an earthen channel (also the first XSec after box culvert). Suddenly, after having reasonable encroachments and water surface changes, I get a +1.52' with the encroachment stations equal to the channel bank stations. I went back and changed the encroachments to Method 1 and moved each one out 200' (i.e., widened the floodway by 400'), only to have the change in water surface rise to +1.90'. Just for fun, went back and changed the encroachment stations to the very first and last point of the cross section, and got a +1.94'. The only way I'm getting to below 1' is to move the encroachment stations to 15' inside the channel bank stations, which isn't allowed.
Anyone else run into this, or have any suggestions? Seems counter-intuitive that the wider I make the encroachment stations, the higher my Prof Delta WS....
Anyone else run into this, or have any suggestions? Seems counter-intuitive that the wider I make the encroachment stations, the higher my Prof Delta WS....