Well my problem (big to me, small for you experts for shure), is the following:
I have a blower that feeds combustion air to an incinerator. The admission of this blower is DN200 (the actual pipe has around 2 meters long). Now, I have to consider to reduce this diameter to DN80 and include a straight pipe around 1.5 meters long. The original pipe will be maintained. As such, the final setting will be a 2 eters long DN200+1.5meter long DN80
I would like to know how much my flow and pressure will be influentiated in these new conditions.
Thanks a lot to all.
PR
Yesterday I already put this thread but for any reason, it disappeared.
Well my problem (big to me, small for you experts for shure), is the following:
I have a blower that feeds combustion air to an incinerator. The admission of this blower is DN200 (the actual pipe has around 2 meters long). Now, I have to consider to reduce this diameter to DN80 and include a straight pipe around 1.5 meters long. The original pipe will be maintained. As such, the final setting will be a 2 eters long DN200+1.5meter long DN80
I would like to know how much my flow and pressure will be influentiated in these new conditions.
Thanks a lot to all.