BigInch
Petroleum
- Jun 21, 2006
- 15,161
B31.8
ss 802.12 This Code does not apply to
....
(f) wellhead assemblies, including control valves,
flow lines between wellhead and trap or separator, offshore
platform production facility piping, or casing and
tubing in gas or oil wells. (For offshore platform production
facility piping, see API RP 14E.)
I am attempting to ascertain current practices as applied in the field. Knowing that there are variations to "interpretation" of the above clause and no doubt of many others in that and all codes, and without casting judgment in any form or fashion, I'd simply like to ask if anyone is aware, or knows of the use of B31.8 to design any "piping segment" between wellhead, trap or separator, either onshore, in a regulated gathering field, or offshore, especially in the GOM. Presumedly that could be attempted by justification, in light of the apparent contradiction with the above 2007 version of B31.8, that such practice was allowed or not prohibited by previous versions of the code, or versions since, by defining any such segment specifically as a "gas pipeline", rather than a "flowline". I've been long gone from the GOM many years now and I am interested to know what has become the SOP of late?
Just yes, or no, without any details, would do.
We are more connected to everyone in the world than we've ever been before, except to the person sitting next to us. Lisa Gansky