DNBEA
Structural
- Sep 26, 2005
- 50
I am currently design a open building which is going to be closed in couple of years. the owner want us to design the footings which are for future walls and columns. I am wondering if there are ways or details for future dowels that can be buried under finish grade but not affect the functin of the open building?