In a project, they made a mistake in installing a mezzanine and the whole structure is shifted. Since the columns are not matching the location of the foundation pads any more, the foundation does not fulfil. Could someone please advise a solution for it?
The foundation is built, and the mezzanine has SHS columns which are connected via post installed anchors to the foundation.