IJR
Structural
- Dec 23, 2000
- 774
Pals
I am going to have to put a structure on a thick compacted fill, because the geotech says 4m(12ft) of soil layer must be removed(poor vegetation layer) and then structure be set up. So we will fill up 3m(9ft) and then let the structure rest 1m(3ft) below ground level
I have done this with single footings before, specifying gravel fills, sometimes concrete fills, at 95percent proctor.
But this time I am going to put a huge structure on top.
I am going to specify a 1m (3ft) thick raft on a large area, and specify a good fill and compaction.
Any problems you expect? Consider thick raft and a large area?
respects
I am going to have to put a structure on a thick compacted fill, because the geotech says 4m(12ft) of soil layer must be removed(poor vegetation layer) and then structure be set up. So we will fill up 3m(9ft) and then let the structure rest 1m(3ft) below ground level
I have done this with single footings before, specifying gravel fills, sometimes concrete fills, at 95percent proctor.
But this time I am going to put a huge structure on top.
I am going to specify a 1m (3ft) thick raft on a large area, and specify a good fill and compaction.
Any problems you expect? Consider thick raft and a large area?
respects