asp1230
Geotechnical
- Sep 19, 2005
- 4
I am working on a project where embedment depth for existing bridge foundation will be reduced. This is third such bridge that we have seen in the recent past. Anybody has any experience with protecting the footing subgrade from frost? Thanks.