mrengineer
Structural
- Feb 11, 2002
- 157
For a 5' diameter straight shaft drilled pier, combination friction and end bearing, lengths 70-90', would you consider dropping off the vertical reinforcing at some point? Surrounding soils are capable of providing lateral support for the entire length of the pier.