Jriad
Petroleum
- May 18, 2006
- 16
Background: Shallow Gas well testing at 120 mcf/d & pulling a lot of water with it; 120 bbl/d. I am playing with the idea of downhole seperation and dumping the water in a lower zone (possibly a hydroclone) and see if it is economically viable.
Questions: Has anyone had experience with downhole seperation with gas and water?
Is there theoretical calculations to determine without the weight/resistance of lifting the water how much gas will be potentially produced?
Thanks,
JR
Questions: Has anyone had experience with downhole seperation with gas and water?
Is there theoretical calculations to determine without the weight/resistance of lifting the water how much gas will be potentially produced?
Thanks,
JR