The level in a particular vessel is controlled by a dedicated level transmitter and LCV. In addition, a separate level transmitter gives a High High trip and the emergency shutdown system closes an isolation valve which is incidentally a fail closed valve. Can this be considered sufficient protection against gas blowby? If not, what further precautions should be taken?