currently we are conducting a Gas turbine GE Frame 5 retrofiring by replacing an obsolete G.T Control system , Generator Control system , dysfunction Cooling System and upgrade the atomizing Air System plus overhauling and inspection the whole machine , the main objectives of project to disposal the obsolescent systems and enhance the machine reliability and availability , can any one advise how to measure the those objectives ?
currently we are conducting a Gas turbine GE Frame 5 retrofiring by replacing an obsolete G.T Control system , Generator Control system , dysfunction Cooling System and upgrade the atomizing Air System plus overhauling and inspection the whole machine , the main objectives of project to disposal the obsolescent systems and enhance the machine reliability and availability , can any one advise how to measure the those objectives ?