breeves
Mechanical
- Aug 23, 2002
- 5
Hi,
My project will receive three 400 MW gas turbines which are new but have been stored at the OEM for about 1 year since their manufacture. My question is: what best practices should have been employed for storage of these units and what tests/inspections should be performed at the OEM works prior to shipping the units to the construction site?
Thanks in advance for your advice.
My project will receive three 400 MW gas turbines which are new but have been stored at the OEM for about 1 year since their manufacture. My question is: what best practices should have been employed for storage of these units and what tests/inspections should be performed at the OEM works prior to shipping the units to the construction site?