Gday all,
New in my posession 2 x 250KVA generators they are to be set up totally independentlly from normal supply with one duty gen and standby gen switched through a 4 pole transfer switch. In OZ und NZ we have a MEN earth system or PME european equivalent. My question should the MEN link be on each generator or on the main switchboard ? I have referred to AS/NZS 3010 Electrical instillation Generator Sets and examples are for interruption to normal supply generator instillations, any help greatly appreciated
Sunnyoz.
New in my posession 2 x 250KVA generators they are to be set up totally independentlly from normal supply with one duty gen and standby gen switched through a 4 pole transfer switch. In OZ und NZ we have a MEN earth system or PME european equivalent. My question should the MEN link be on each generator or on the main switchboard ? I have referred to AS/NZS 3010 Electrical instillation Generator Sets and examples are for interruption to normal supply generator instillations, any help greatly appreciated
Sunnyoz.