Jan 7, 2010 #2 rmw Mechanical Feb 6, 2002 5,724 safaa, You are missing the verb in your sentence. Without the verb it is difficult to determine what you are trying to do. Some verbs that I can think of that would fit are; calculate, measure, remove, replace, install, paint, and there are many more. Please give us the verb that fits your problem. rmw Upvote 0 Downvote
safaa, You are missing the verb in your sentence. Without the verb it is difficult to determine what you are trying to do. Some verbs that I can think of that would fit are; calculate, measure, remove, replace, install, paint, and there are many more. Please give us the verb that fits your problem. rmw
Jan 7, 2010 Thread starter #3 safaa Mechanical Jan 14, 2004 5 sorry you right , where I can find a mothed or equations to design diesel generator stack (diameter and hight) Thanks Upvote 0 Downvote
sorry you right , where I can find a mothed or equations to design diesel generator stack (diameter and hight) Thanks
Jan 9, 2010 #4 dcasto Chemical Jul 7, 2001 3,570 its all about velocity. The EPA has regulations on stack velocities, google it from them I would imagine that other countries have the same requirements. Upvote 0 Downvote
its all about velocity. The EPA has regulations on stack velocities, google it from them I would imagine that other countries have the same requirements.