uppercut
Marine/Ocean
- Nov 26, 2002
- 3
i have been asked to look at a problem were a generator comes on line via a time clock. it is a simple 2 contactor changeover system with a mains failure unit. the problem is that it is in a petrol station with incandescent ligting throughout, and when the changeover takes place the lights require a electronic/warmup period, leaving the place in darkness for a while. i had thought of syncing the gen to the mains running in parrallel then dropping out the main contactor. can i re-sync back to the mains then drop out the gen? or any wiring modification you can think of, like staggering the lights between mains and gen power.?