Hi Everyone,
I am new to the forum but I have a question I could get some assistance with.
I have designed a dispersal bed for a septic system and I am required to do a ground water mounding and break out calculation. I am new to this area and cant find any resources on how to do it. I'm looking for an equation to get me started. I have the information on existing soil conditions and parameters just need something to plug it into.
-David Patterson
I am new to the forum but I have a question I could get some assistance with.
I have designed a dispersal bed for a septic system and I am required to do a ground water mounding and break out calculation. I am new to this area and cant find any resources on how to do it. I'm looking for an equation to get me started. I have the information on existing soil conditions and parameters just need something to plug it into.