Hello
I am handling the design of a substation limit whose grounding design is with with very high GPR, while Step and touch are within limits. The normal practice is to use conductor and rods.
What possible method is to bring GPR close to the acceptable limit.
Can I use remote contribution less than 100%.
The surface thickness more than 1.5m.
The asphalt surface resistivity more than 3000 ohm m?
The number of outgoing feeders more than 1 and distribution feeders as per actual?
The utilization of GEM in extremly dry rocky area?
The available area is 50x50 m and top layer is having resistivity more than 1000 ohm m.
Please guide me in this regard.
Asad
I am handling the design of a substation limit whose grounding design is with with very high GPR, while Step and touch are within limits. The normal practice is to use conductor and rods.
What possible method is to bring GPR close to the acceptable limit.
Can I use remote contribution less than 100%.
The surface thickness more than 1.5m.
The asphalt surface resistivity more than 3000 ohm m?
The number of outgoing feeders more than 1 and distribution feeders as per actual?
The utilization of GEM in extremly dry rocky area?
The available area is 50x50 m and top layer is having resistivity more than 1000 ohm m.
Please guide me in this regard.
Asad