theCorkster
Geotechnical
- Sep 2, 2005
- 146
I'm working on a project that will involve temporary shoring with sheet piling in order to expand a waste treatment plant located with about 100 feet of an existing flood levee. Excavations will be on the order of 20 to 25 feet deep, of various sizes, and site is located on alluvium consisting of sands, some gravel, clay and silt (lenticular disposition).
After completion of construction, I want to grout voids created by removal of the sheet piling to address the potential for groundwater seeping to the surface. I'm planning on using a cementitious grout with sand.
Does anyone have experience with this approach, or thoughts about sealing voids left after sheet pile removal? Thanks,