mihokie
Civil/Environmental
- Apr 7, 2009
- 1
I am trying to design a guardrail on top of a precast modular block retaining wall and am looking for references on how to apply forces from a post and beam guardrail to the wall.
AASHTO recommends a 1 meter setback from the blocks and a 300 plf force applied to the top two layers of geogrid for a MSE wall. I am trying to find out how to apply loads from the guardrail on a smaller wall with no geogrid reinforcement.
AASHTO recommends a 1 meter setback from the blocks and a 300 plf force applied to the top two layers of geogrid for a MSE wall. I am trying to find out how to apply loads from the guardrail on a smaller wall with no geogrid reinforcement.