sjhgeotech
Geotechnical
- May 8, 2006
- 17
I need to design a buried pipe for an H-20 loading. What area due I apply the load over at the surface of the ground? Should I only use the 32 kip load?
Thanks!
Thanks!
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.