1
I am designing a cement-treated base (CTB) using the PCA design guidelines for a pavement over soft ground. The subgade will be a silty soil. I was asked by the PM if my design included AASHTO H-25 loading and now I understand it has to do with how axle loads are transferred to drainage structures (culverts?). The road is rural and most of the heavy traffic is 56,000 pound 4-axle gravel dumptrucks with a tandem axle (the fourth axle is retractable).

The PCA design procedure uses the fatigue factor to estimate CTB thickness. Does the AASHTO H-25 load diagram apply to the fatigue factor calculation?

 
Replies continue below

Recommended for you

The AASHTO H-25 loading is a fictitious theoretical design truck.

Here is a primer on AASHTO pavement design that hopefully will help:


Many other resources are also available online. Google "AASHTO pavement design"

Jeff
 
In bridge design we normally use HS-20 loading, and if we were asked to use HS-25 loading we would have a corresponding increase in the fatigue distress. You may need to increase your fatigue values by 25% in this case.
 
Since you are looking at a pavemet, not a structure, you may have better luck looking at ESALS, not H-loading.

How many ESALS per HS-25?

"...students of traffic are beginning to realize the false economy of mechanically controlled traffic, and hand work by trained officers will again prevail." - Wm. Phelps Eno, ca. 1928

"I'm searching for the questions, so my answers will make sense." - Stephen Brust

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor