MMDeacon
Industrial
- Jan 12, 2006
- 5
Any ideas on how to ensure that components are placed in the right locations on the PWA during hand add-on and soldering operations? I am looking for somthing the add-on operator can use themselves to verify their own work. We are using both through hole and SMT components.