Dear all member,
Bachgound
U-stamp vessel without require heat treatment by original construction Code(SC-VIII-1) and User design spec. After vessel inservice for period of time(unknown for now), User require R-Stamp certificate holder to perform "Heat treatment with whole vessel".
Question 1: With this requirement by user, this activity should be consider Repair or Alteration accordance to NBIC-NB23;
Question2: R-Stamp certificate holder should do any design calculation, NDE(before/after heat treat),Hydro test e.t.c.
Thanks inadvance for all comment sir.
Bachgound
U-stamp vessel without require heat treatment by original construction Code(SC-VIII-1) and User design spec. After vessel inservice for period of time(unknown for now), User require R-Stamp certificate holder to perform "Heat treatment with whole vessel".
Question 1: With this requirement by user, this activity should be consider Repair or Alteration accordance to NBIC-NB23;
Question2: R-Stamp certificate holder should do any design calculation, NDE(before/after heat treat),Hydro test e.t.c.
Thanks inadvance for all comment sir.