ZachE
Specifier/Regulator
- Apr 18, 2005
- 3
If an open 55 Gallon drum is considered a vapor source and requires Class 1 Division 1 equipment, what options are available for heating this material?
I have an electic band heater rated Class 1 Division 2.
Ideally, I'd like to be able to control the temperature during our process while the drum is fully opened. (Ambient temperature varies drastically). (Goal temperature less than 10% of AIT).
If heating at the location of the process is infeasible, 2nd best would be bringing the drum to goal temperature and then moving the material to the process.
Also, If heated away from the process and the drum is vented, rather than opened, how does that change the requirements (if the drum is located in an otherwise non-hazardous location). What does proper venting entail?
Thank you in advance for any help you advice you might offer.
Zach
I have an electic band heater rated Class 1 Division 2.
Ideally, I'd like to be able to control the temperature during our process while the drum is fully opened. (Ambient temperature varies drastically). (Goal temperature less than 10% of AIT).
If heating at the location of the process is infeasible, 2nd best would be bringing the drum to goal temperature and then moving the material to the process.
Also, If heated away from the process and the drum is vented, rather than opened, how does that change the requirements (if the drum is located in an otherwise non-hazardous location). What does proper venting entail?
Thank you in advance for any help you advice you might offer.
Zach