Chewi00
Geotechnical
- Aug 3, 2004
- 60
Is there an advantage to using a standard sheetpile (e.g. AZ-18) with a moderate section modulus and have to use interior bracing, rather than specifying a pile with a section modulus of 75-80 in^3 in order to achieve a cantilevered dig? I see a lot of designs that could be modified to get away with a very heavy cantilevered section but chose to use a lighter pile with tiebacks or cross-bracing.
Thanks in Advance
Adam
Thanks in Advance
Adam