I'm working on a project at the junction of two large rivers (30,800 CFS). There are multiple existing bridges over each of the two rivers (all bridges are skewed, 2 are at 40-degrees). My question is how should I model the bridges? The Section lengths are much longer/larger than the bridges.
1. Do I revise my HEC-RAS Section so that it is perpendicular to flow at the bridges and adjust the bridge dimensions accordingly? If so, how should I show my analysis Section on the drawing?
.... or .....
2. Should I simply use the "Skew Bridge" command from the Bridge Editor? Would this option affect the entire Section length (i.e., beyond the bridge extents)?
All responses/advice/opinions appreciated. Thanks.
1. Do I revise my HEC-RAS Section so that it is perpendicular to flow at the bridges and adjust the bridge dimensions accordingly? If so, how should I show my analysis Section on the drawing?
.... or .....
2. Should I simply use the "Skew Bridge" command from the Bridge Editor? Would this option affect the entire Section length (i.e., beyond the bridge extents)?