burt53
Civil/Environmental
- Jan 5, 2010
- 2
Hello,
I've started a project in HEC-RAS v. 4.1 and entered in all my geometry and flow data. I'm analyzing existing and post-project information. When I go to create a plan, I'm able to create one plan and run it with no problems. When I try to create another plan, however, it gives me an error message:
"A flow needs to be specified at the top of the reach"
When I go back to my flow data, it has been erased for both existing and post project. I've tried re-starting the computer, starting a new project, etc. Several things I've tried, but I continue to have the same problem. Anyone run into this before?
I've started a project in HEC-RAS v. 4.1 and entered in all my geometry and flow data. I'm analyzing existing and post-project information. When I go to create a plan, I'm able to create one plan and run it with no problems. When I try to create another plan, however, it gives me an error message:
"A flow needs to be specified at the top of the reach"
When I go back to my flow data, it has been erased for both existing and post project. I've tried re-starting the computer, starting a new project, etc. Several things I've tried, but I continue to have the same problem. Anyone run into this before?