RussHar
Civil/Environmental
- Sep 3, 2008
- 2
Could or how would Hec-Ras be used to model a detention basin? Is that an appropriate use of the model? I have a detention basin that collects in excess of 50 ac and therefore regulated via flood hazard rules. I had always thought Hec-Rac was better suited for flow through open ended sections......and not really suited for pond routing. However, it seems that the review process has generated the need to review the basin having been modeled via Hec-Ras.