JENG
Geotechnical
- Dec 16, 1999
- 1
Will welcome suggestions on approach to drilling/coring in formation with interlayering of clay and chert. We have cored ~ 40 feet in chert and get stalled by presence of voids in chert formation with loss of drilling mud and cuttings falling back in the borehole. Still need to go down at least another 25 feet