hi at all
I've defined a set of jobs in abaqus, but it runs them all at the same time. I want it to start a new job after the previous one is completed.
Is there any command to force it do so ?
 
Replies continue below

Recommended for you

Create a text file with proper code and include interactive command so that each job is submitted after the previous one finishes. Then change the extension of this file to bat and run it by double clicking.

Here’s an example:

call abq2020 job=... interactive
call aba2020 job=... interactive
call abq2020 job=... interactive
 