VELCROW
Mechanical
- Apr 30, 2008
- 92
Is there any way to reorder the holes in a hole table?
Is there any way to continue the lettering convention from one sheet to the next?
I have about 100 M4 holes on Sheet 2, (A1-A100 on the hole table). When I make a second hole table on Sheet 3 for other holes (M6, etc.), it starts at A again, which can be confusing. I wrote a macro to reletter the tags on Sheet 3, which worked well... until I have to add holes. It sticks the new holes in the middle of the list.
For example, on sheet 3 I have M6 holes B1-B20. When I add two more M6 holes, it calls them A30-A31. That's fine, I can reletter them, but I want the new holes at the end of the list, and SW sticks them between B15 and B16. Is there some way to just move them down the list?
Is there any way to continue the lettering convention from one sheet to the next?
I have about 100 M4 holes on Sheet 2, (A1-A100 on the hole table). When I make a second hole table on Sheet 3 for other holes (M6, etc.), it starts at A again, which can be confusing. I wrote a macro to reletter the tags on Sheet 3, which worked well... until I have to add holes. It sticks the new holes in the middle of the list.
For example, on sheet 3 I have M6 holes B1-B20. When I add two more M6 holes, it calls them A30-A31. That's fine, I can reletter them, but I want the new holes at the end of the list, and SW sticks them between B15 and B16. Is there some way to just move them down the list?