I'm attempting to build a 2 story house on property that I bought a few years back. The land is waterfront land in Florida.
Prior to building I had soil borings done. For the first 8 feet the soil is sand and clay with a blow count of 5.
From 8 feet to 16 feet I have a layer of loose to very loose organics with a blow count between 0 and 2.
From 16 to 22 feet I have dense sand with a blow count of 12.
Down to 100 feet I have a few 5 foot thick sections with high blow counts between 12 and 50.
Not until 100 feet do I get some decent bearing starting at 16 blows up to 73 blows at 110 feet.
My builder basically has left the foundation with me. He says he has no experience in complex foundation systems and basically I need to handle coming up with a solution. I've already talked to the Geopier folks and they say that because of the subsurface organics layer their system won't work. They suggested that I put a surcharge load on the foundation site. Basically a 5 foot thick block of concrete to settle the site and then build on top of that. Sounds kindof brute force to me.
These kinds of engineering problems are totally outside of my realm of knowledge (I'm in software) so I want to get some advice from you what I should do.
Thanks for your time.
Prior to building I had soil borings done. For the first 8 feet the soil is sand and clay with a blow count of 5.
From 8 feet to 16 feet I have a layer of loose to very loose organics with a blow count between 0 and 2.
From 16 to 22 feet I have dense sand with a blow count of 12.
Down to 100 feet I have a few 5 foot thick sections with high blow counts between 12 and 50.
Not until 100 feet do I get some decent bearing starting at 16 blows up to 73 blows at 110 feet.
My builder basically has left the foundation with me. He says he has no experience in complex foundation systems and basically I need to handle coming up with a solution. I've already talked to the Geopier folks and they say that because of the subsurface organics layer their system won't work. They suggested that I put a surcharge load on the foundation site. Basically a 5 foot thick block of concrete to settle the site and then build on top of that. Sounds kindof brute force to me.
These kinds of engineering problems are totally outside of my realm of knowledge (I'm in software) so I want to get some advice from you what I should do.
Thanks for your time.