We have a 1:2 slope about 4m high as a ditch slope in very expensive clay soils. The slopes are clay fill compacted to 95% modified proctor.
Are you aware of any products that can stabilize such a slope. Soil nailing was one option mentioned. Do you have any other ideas. How does soil nailing work given that the slope is 4m high since the drilling machine seems to be the only way to install these soil nails.
Keep in mind we are trying to remedy a mistake made by the contractor. Ideally the slopes were to be 1:2 using a granular material. We cannot reduce the slope either due to adjacent highway.
Are you aware of any products that can stabilize such a slope. Soil nailing was one option mentioned. Do you have any other ideas. How does soil nailing work given that the slope is 4m high since the drilling machine seems to be the only way to install these soil nails.
Keep in mind we are trying to remedy a mistake made by the contractor. Ideally the slopes were to be 1:2 using a granular material. We cannot reduce the slope either due to adjacent highway.