wes616
Aerospace
- Mar 19, 2005
- 940
Well this isn't so much a technical question as a procedural question. What method do you use to populate rivets in your bill of materials. I currently need to insert the rivet (as a solid) into the assembly in order to "call out" the rivet using the automated item baloon, and to populate the bill of materials. I know that many people on here have different methods of representing rivets, but I am curious how you "call out" the rivet on the face of a drawing (for those of you making drawings) and how do you populate your Parts List?
Wes C.
------------------------------
No trees were killed in the sending of this message, but a large number of electrons were terribly inconvenienced.
Wes C.
------------------------------
No trees were killed in the sending of this message, but a large number of electrons were terribly inconvenienced.