Nichyin
Petroleum
- Feb 12, 2012
- 11
Good morning all,
I have a question with regards to sizing an orifice line.
I have a situation whereby the flow in the pipeline is 500kg/hr downstream of a valve =, of a certain gas, and my customer would like to restrict the flow to 200kg/hr.
The question is, when I input the data into my company's orifice sizing program, for the flow rates, what values do I put? I want to use 200kg/hr for the both the maximum and normal flow as we are sizing for a 200kg/hr line based on a given pressure drop, and I've done the necessary workings but I am still unsure about my method.
I appreciate all the help in advance!
I have a question with regards to sizing an orifice line.
I have a situation whereby the flow in the pipeline is 500kg/hr downstream of a valve =, of a certain gas, and my customer would like to restrict the flow to 200kg/hr.
The question is, when I input the data into my company's orifice sizing program, for the flow rates, what values do I put? I want to use 200kg/hr for the both the maximum and normal flow as we are sizing for a 200kg/hr line based on a given pressure drop, and I've done the necessary workings but I am still unsure about my method.
I appreciate all the help in advance!