I am rather new to Ansys Workbench and still a bit figuring out how this program works. But I am trying to run a rather large solution wich unfortenatley stops after 1000 substeps.
Somehow one can change these substeps with the /config command. I have already tried several things but can't find the right way to put in the command.
Can someone please give me a hand?
Thanks a lot in advance.