BillsSis
Civil/Environmental
- Apr 3, 2015
- 25
I'm fairly new to this much in-depth study of hydrology and hydraulics; so forgive me if I sound ignorant. I used to use mainly the Rational Method; now I'm using TR-55 and HEC-HMS. Most of the drainage areas I come across are less than one square mile or 640 acres.
My question is this: when using TR-55 and trying to figure the channel travel time, how do I go about assuming what the bank full elevation is of the channel? Once i figure what that is, I can figure out what the velocity is, then the travel time.
Thanks everyone!
My question is this: when using TR-55 and trying to figure the channel travel time, how do I go about assuming what the bank full elevation is of the channel? Once i figure what that is, I can figure out what the velocity is, then the travel time.
Thanks everyone!