jamesbanda
Chemical
- Sep 21, 2004
- 223
Dear sirs,
I've read lost of really detailed articles about pipeline surge or water hammer. I am working on project with short lines <2 km. Most less than 300meters, I want to calculate if there is likely to be a surge problem and if i need to specify slow closing valves.
Can anyone please point me in the correct direction of a calculation guide.
I've read lost of really detailed articles about pipeline surge or water hammer. I am working on project with short lines <2 km. Most less than 300meters, I want to calculate if there is likely to be a surge problem and if i need to specify slow closing valves.
Can anyone please point me in the correct direction of a calculation guide.