cabalen
Mechanical
- Aug 13, 2003
- 41
We are designing a shopping mall and one of the requirements is to provide smoke extraction system. Can anyone tell me of the necessary code or standard for the design calculation for this requirement. Is it by means of air change per hour, if it is how how much air change is required for a shopping mall project?