wedostr2
Structural
- Mar 26, 2009
- 2
We have an existing wood framed vaulted ceiling roof that is poorly insulated. We are going to install new rigid insulation, R-38 to bring it to current codes, above the original roof sheathing and cap that with a new layer of OSB. We plan to fasten through the new construction into the original sheathing with long washer-headed screws, but I cannot find any information to use in determining the appropriate fastener spacing. Any help would be appreciated.