There is a steel shimmed circular tank of diameter 6.0 m which needs grout to be poured beneath its base plate.
What is the proper way to apply grout under this area rather than just pouring using a circular formwork to ensure that the grout really sealed all the voids beneath the tank base plate, will using a grout pump makes any difference than the normal manual pouring method?