Hi guys hope you can help me with this. We are to relocate the existing 375 AC pipe at the toe of the road batter by laying a new 400 PE mainline about 25m from its original location. The road will be upgraded into 4 lanes and the existing ground is mud soil about 2-4m depth. Here are my queries.
1. What is the best effective protection strategy in laying the new PE mainline
2. The AC pipe has been there for more than 30 yrs and it is expected that settlement has already been taken place but there are section in the road upgrade where immediate road approaches will cross over the AC pipe and that portion of pipe will not be relocated. How shall we protect them from the additional loading that it will carry. Will concrete slab be adequate enough to distribute the loads on the sides?
Help guys pls thanks
1. What is the best effective protection strategy in laying the new PE mainline
2. The AC pipe has been there for more than 30 yrs and it is expected that settlement has already been taken place but there are section in the road upgrade where immediate road approaches will cross over the AC pipe and that portion of pipe will not be relocated. How shall we protect them from the additional loading that it will carry. Will concrete slab be adequate enough to distribute the loads on the sides?
Help guys pls thanks