gt5879c
Civil/Environmental
- Oct 31, 2006
- 23
My drip field property is pretty steep over most of the site (>30%). There has been rain or snow 2 days out of every week for the last month. The contractor is chomping at the bit to begin installation of the drip field, but it's just too wet. He is asking how wet is too wet for installation? He wants to get laborers out there to begin installation since they won't be able to use a vibratory plow since it's too wet and steep. How would I determine if it's dry enough to install by hand?