BadgerPE
Structural
- Jan 27, 2010
- 500
I have a situation where the client is requesting an HSS 12x8 outrigger be welded directly to the face of an HSS 12x12 column. Assuming that all of the checks work out on the column, (plastification, etc.) is there anything inherently wrong with a connection like this? Due to the applied moment at the beam/column interface, I am assuming it will need to be a full-pen weld to develop the required flange strength. This is a roof so gravity snow loading is controlling the design. Furthermore, it is in SDC B so not a lot of special requirements to meet.