TimmyH76
Structural
- Mar 14, 2006
- 89
Anyone have any insight into the practice of dry stacking CMU for manufactured housing piers with respect to the HUD permanent foundation manual. I have asked several people in this area (SW Virginia) about this. Everyone I have talked with that does these evaluaions believes that drystacking is the norm, but as I read the manual (Section 503.4), dry stacking is not allowed? Any help would be appreciated.