Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

HY-8 and Multiple Culverts

Status
Not open for further replies.

saruman26

Civil/Environmental
Oct 31, 2005
72
I am getting an odd error in HY-8 when analyzing multiple culverts.

My situation is this - a new road crossing, with two arch RCP pipes. The first is a 62x102 with the invert buried into the stream bed 12". The second pipe is a 54x88 with the invert at the stream bed elevation. When running the analysis, I get two different headwater elevations, and most of the flow is routed through the smaller culvert, and the roadway overtops.

When I check the design flow for a similar condition in Hydraflow Express, I get adequate freeboard and no overtopping. Any ideas? I have attached the file in question.
 
Replies continue below

Recommended for you

Update on this post. I created a new HY-8 file and entered the data anew. This time, I get the same W.S.E. for both culverts. Now it appears to work.

I stumbled upon a similar post here from 10/2008 where the user had the same problem. Perhaps an odd glitch in the coding?

Thanks in advance to anybody who might have responded.
 
Are you using the latest version? The previous version of HY8 definitely had a few glitches.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor