saruman26
Civil/Environmental
- Oct 31, 2005
- 72
I am getting an odd error in HY-8 when analyzing multiple culverts.
My situation is this - a new road crossing, with two arch RCP pipes. The first is a 62x102 with the invert buried into the stream bed 12". The second pipe is a 54x88 with the invert at the stream bed elevation. When running the analysis, I get two different headwater elevations, and most of the flow is routed through the smaller culvert, and the roadway overtops.
When I check the design flow for a similar condition in Hydraflow Express, I get adequate freeboard and no overtopping. Any ideas? I have attached the file in question.
My situation is this - a new road crossing, with two arch RCP pipes. The first is a 62x102 with the invert buried into the stream bed 12". The second pipe is a 54x88 with the invert at the stream bed elevation. When running the analysis, I get two different headwater elevations, and most of the flow is routed through the smaller culvert, and the roadway overtops.
When I check the design flow for a similar condition in Hydraflow Express, I get adequate freeboard and no overtopping. Any ideas? I have attached the file in question.