hobeex1
Civil/Environmental
- Oct 8, 2005
- 4
I am trying to calculate how flow will be split over 4 side weirs coming off a common channel. The channel is a feeder channel to 4 identical process tanks (stopping just after the last weir), and the aim is to design the system such that as equal a flow split as possible is achieved between the 4 tanks fed from it.
I am trying to convince someone that, although there may be some variation in discharges over the 4 weirs, it can be kept to a minimum by selecting the correct channel cross section and weir heights, thereby eliminating the need for a distribution chamber. I'm hoping to keep the weir heights equal if possible.
I'm at the edge of my hydraulic knowledge with this one, so I'd appreciate any advice on whether I'm correct in my assumption, and how I can prove it.
I am trying to convince someone that, although there may be some variation in discharges over the 4 weirs, it can be kept to a minimum by selecting the correct channel cross section and weir heights, thereby eliminating the need for a distribution chamber. I'm hoping to keep the weir heights equal if possible.
I'm at the edge of my hydraulic knowledge with this one, so I'd appreciate any advice on whether I'm correct in my assumption, and how I can prove it.