Hi everybody,
i've to evaluate the failure probability of penstock
and water conveyance (open channel-canal flume) system
of a hydro-dam existing project;
i.e. the elements not properly belonging to the dam body.
Any suggestions on existing regulations or guidelines?
All i've found regards directly dams bodies and there is
nothing concerning penstock or water conveyance safety assessment.
The best i've found (probability) is FERC "Engineering Guidelines
for the Evaluation of Hydropower Projects", but the chapter concerning penstock is in preparation.
Thank you all for all your assistance,
Dario
i've to evaluate the failure probability of penstock
and water conveyance (open channel-canal flume) system
of a hydro-dam existing project;
i.e. the elements not properly belonging to the dam body.
Any suggestions on existing regulations or guidelines?
All i've found regards directly dams bodies and there is
nothing concerning penstock or water conveyance safety assessment.
The best i've found (probability) is FERC "Engineering Guidelines
for the Evaluation of Hydropower Projects", but the chapter concerning penstock is in preparation.
Thank you all for all your assistance,
Dario