wglenn1
Civil/Environmental
- Jan 21, 2013
- 1
I have two ponds on one site that are going to be connected with a pipe. I have it set up for the East Pond to have a culvert outlet to go into the west pond. I have the same starting elevation in both ponds at 3.0'. The invert of the outlet culvert on the east pond is 2.0. The west pond is where I have my main outlet and an emergency overflow weir. I can't get the east pond water surface to change when the water surface in the west pond raises. I am running the dyn stor ind method.
I don't want to run both ponds in one pond with multiple storage definitions. I just want to be sure that the equalizing pipe between the ponds works as it should.
Any help or suggestions?
I don't want to run both ponds in one pond with multiple storage definitions. I just want to be sure that the equalizing pipe between the ponds works as it should.
Any help or suggestions?